Checklists For May 31st Launch
Here are the detailed checklists (as of 5/20/09) for the May 31st Launch
Launch Tower
- 4 sand screws
- 4 sand screw eyelets
- 3 turnbuckles
3 cables w/1 spare (guy lines)
lower tower
- upper tower
- base plate
bolts to connect lower and upper towers
antenna
antenna mount and u-bolts
launch rail
- launch computer
- solar panel
- 20 ft coax
- away box cable
- 2 batteries
Launch Control
- launch control table
- battery
rptnc to n-male connector
jpole
- bbq antenna
- upper pole
- lower pole
- tripod
wood base
pl259 coax cable
n connector coax cable
launch control parts box
Rocket
- nosecone
- nosecone pusher
- nosecone puller
- nosecone tip
no-sep ring (NSR)
recovery module
- payload module
- avionics module
- motor frame
- coupler
- nozzle
- nozzle washer
- motor snap rings
thousands of screws
fins
- igniters
- aero shell
- launch lugs
- fin clamps
- o-rings
- forward closure (aka Plug Thing)